Release Notes - Draft / Final


35209 : ABAP Backorder Rejection


Admin Info



Purpose
Changes to the back order rejection program to consider the remaining open order qty at schedule line level
Release No
001
Submitted on
05/06/2017
Submitted by
Deepak Yasam
Environment
NECNED to NECNEQ
Sent To
Rizwan Shah
Object(s) created by
Damodar Sanagana
Object(s) tested by
Deepak Yasam
Transport Status
Created in NECNED100

Transport and Technical Objects


Sl.
Transport ID
Description
Object Name
1
NEDK940407
SD:35209:Rejection at schedule line level
ZSD_SMALLORD_REJ

Release Notes


For Infrastructure

While moving the TR's to NEP, the below TR should be moved first followed by the above new TR.

For Requestor

Below is the previous transport.

NEDK940122 SD:15361:Bug fix to consider del.for any size-backorder prgm

Test Notes


System : NECNED300

Test ID
Test Scenario
Expected Result
Actual Result
Test Documents
P/F
SD-001
1.Create a SO with multiple materials and multiple sizes.
Execute delivery creation and back order rejection program in background
The delivery shouldn't be created as allocation is not done for the SO
The delivery is not created as allocation is not done for the SO
SO - 78348
P
SD-002
1.Create a SO with multiple materials and multiple sizes.
2.Partially Allocate single size of each material
1. The delivery should be created for the allocated sizes.
2.The Remaining qty should be rejected with ZI rejection reason for the partial delivered size as the remaining open order qty is < or = 6.
3. The sizes that doesn't have a partial delivery shouldn't be rejected though the open qty is < or = 6
1. The delivery is created for the allocated sizes.
2.The Remaining qty is rejected with ZI rejection reason for the partial delivered size as the remaining open order qty is < or = 6.
3. The sizes that doesn't have a partial delivery are not rejected though the open qty is < or = 6
SO - 78349
Del - 85000087
P
SD-003
1.Create a SO with multiple materials and multiple sizes.
2.Allocate the SO such that the remaining unallocated order qty should be less than 6.
1. The delivery should be created for the allocated sizes.
2. The sizes that doesn't have a partial delivery shouldn't be rejected though the open qty is < or = 6
1. The delivery is created for the allocated sizes.
2. The sizes that doesn't have a partial delivery are not rejected though the open qty is < or = 6
SO - 78350
Del - 85000091
P
SD-004
1.Create a SO with multiple materials and multiple sizes.
2.Allocate only first material.
1. The delivery should be created for the allocated sizes.
2.Remaining materials shouldn't be rejected with ZI rejection reason though remaining open order qty is < or = 6.
1. The delivery is created for the allocated sizes.
2.Remaining materials are not rejected with ZI rejection reason though the remaining open order qty is < or = 6.
SO - 78351
Del - 85000091
P
SD-005
1.Create a SO with multiple material and multiple sizes.
2.Partially Allocate first and last size of each material.
1. The delivery should be created for the allocated sizes.
2.The partial delivered sizes should be rejected if the remaining open order qty is < or = 6.If the qty is more than 6 then they shouldn't be rejected.
3. The unallocated remaining sizes shouldn't be rejected though the open order qty is < or = 6.
1. The delivery is created for the allocated sizes.
2.The partial delivered sizes are rejected if the remaining open order qty is < or = 6.If the qty is more than 6 then they are not rejected.
3. The unallocated remaining sizes are not rejected though the open order qty is < or = 6.
SO - 78352
Del - 85000088
p
SD-006
1.Create a SO with multiple material and multiple sizes.
2.Allocate all the materials in the SO.
3.Create partial delivery for some of the sizes in the SO .
4. After the partial delivery creation reallocate the undelivered qty.
1. The delivery should be created for the allocated sizes.
2.The deallocation should happen for the partial delivered sizes and should rejected with ZI rejection reason if the remaining open order qty is < or = 6.
3. The deallocation should happen for the undelivered allocated sizes and they shouldn't be rejected.
1. The delivery is created for the allocated sizes.
2.The deallocation occured for the partial delivered sizes and are rejected with ZI rejection reason if the remaining open order qty is < or = 6.
3. The deallocation occured for the undelivered allocated sizes and they are not rejected.
SO - 78353
Del - 85000089
P
SD-007
1.Create a SO with same material and different plants.
2.Partially Allocate the sizes of both the materials
1. The delivery should be created for the allocated sizes.
2.Remaining sizes should be rejected with ZI rejection reason as the remaining open order qty is < or = 6.
3.Delivery shouldn't be created for other materials as they are not allocated.
1. The delivery is created for the allocated sizes.
2.Remaining sizes are rejected with ZI rejection reason as the remaining open order qty is < or = 6.
3.Delivery is not created for other materials as they are not allocated.
SO - 78354
Del - 85000090 , 85000092
P

System: NECNEQ100


None


Reference Document (Specification or Production Support Break Fix)


ABAP - Damodhier - Deepak - 2017-05-22 - 35209 - Service Request - ABAP - Backorder Rejection (Rizwan by 2017-06-05)